MAN Bus Factory
The production lines at MAN's bus factory in Ankara required heavy bodies and components to be lifted safely along the line; what was needed was not a single platform but a multi-unit system keeping pace with production. Edessa Asansör installed 8 scissor lift platforms of 3,500 kg capacity, distributed across the production lines. The platforms were commissioned to operate in synchronization, so lift operations at different stations proceed without slowing the production flow. The project became a concrete example of Edessa's capacity to support large-scale industrial operations with multiple synchronized systems, and it contributes directly to the factory's production continuity.